Estimating
Takeoffs and estimates, traceable to the sheet.
Quantity takeoffs, material takeoffs, labor estimates, bid estimates, budget estimates and detailed cost estimates — each quantity tied to a highlighted area, line or count on a specific drawing sheet, organized by CSI MasterFormat division.
We highlight
Every quantity is tied to a highlighted area, line or count on a specific sheet — slab, footing, partitions, doors, windows, finishes.
You audit
Select any line in the takeoff table and its highlight lights up on the plan. Your estimator checks a number instead of measuring it again.
You bid
Takeoffs feed bid estimates, budgets and value engineering — numbers your team can defend, because each one points at a drawing.
Try the sample takeoff.
Sample takeoff · CSI MasterFormat
| Division | Item | Qty |
|---|---|---|
| 03 30 00 | Slab on grade, 4 in. | 600 SF |
| 03 30 00 | Continuous footing | 98 LF |
| 06 10 00 | Interior partitions, 2×4 | 42 LF |
| 08 10 00 | Doors, with hardware | 4 EA |
| 08 50 00 | Windows | 6 EA |
| 09 65 00 | Resilient flooring, LVP | 467 SF |
| 09 30 00 | Tile, bathroom floor | 72 SF |
Sample net quantities before waste. Not a quote, not a complete project estimate. Each line traces to a sheet and a highlight.
What we don’t put in writing.
No invented pricing, no cost guarantees, no savings percentages, no turnaround promises. An estimate is only as good as the drawings behind it — so we show you the drawings behind every number, and scope every engagement in writing before it starts.
Every trade. One coordinated estimate.
Organized the way bid forms are: by CSI MasterFormat division.
Have drawings ready? Let’s get your project moving.
Send us the set — or just a sketch. We’ll scope the takeoff in writing. [email protected]
Request an Estimate →